Carnet 49An independent journal, with its receipts
Français

Projects

Pipes, lines, ports and mines, and which way each one points. Southbound capacity is the US side of the outcome; tidewater capacity is what lets Canada sell to other buyers. This is not a list of every project in Canada, nor a map of everything already flowing to the US. It is the projects our articles and forecasts rely on: mainly new ones, plus a few existing systems (such as the main oil and gas export pipelines) listed as a baseline to compare against. Many other lines, mines and plants exist that we don’t track, because they don’t bear on the questions we follow, at least for now.

Projects by direction and stage
DirectionProjectsCommitted (in service, building or decided)Not yet committed
South Carries Canadian output to the United States.862
Tidewater Reaches a coast, so Canada can sell to buyers other than the US.1797
Mixed Can go more than one way.20810
Domestic Serves Canada itself.1358

58 of 58 projects shownClear filters

South: Carries Canadian output to the United States.

ProjectWhatStageCapacity
Champlain Hudson Power Express (CHPE)Electricity · QCIn service1,250 MW
Enbridge Mainline (existing)Oil · ABIn service3,230 kb/d
Gas export pipelines to the US (existing, aggregate)Gas · AB/BCIn service8.6 Bcf/d
Keystone (existing)Oil · ABIn service607 kb/d
New England Clean Energy Connect (NECEC)Electricity · QCIn service1,200 MW
Enbridge Mainline Optimization Phase 1Oil · ABFinal investment decision150 kb/d
Prairie Connector (South Bow / Bridger, partial Keystone XL revival)Oil · ABProposed550 kb/d
Enbridge Mainline Optimization Phase 2Oil · ABPostponed250 kb/d

Tidewater: Reaches a coast, so Canada can sell to buyers other than the US.

ProjectWhatStageCapacity
Coastal GasLink pipelineGas · BCIn service2.1 Bcf/d
LNG Canada Phase 1LNG · BCIn service14 Mtpa
Port of Churchill and Hudson Bay Railway (current operations)Port · MBIn service–
Cedar LNGLNG · BCUnder construction3.3 Mtpa
Contrecoeur container terminal (Port of Montreal)Port · QCUnder construction1,150,000 TEU/yr
LNG Canada Phase 2LNG · BCUnder construction14 Mtpa
Trans Mountain drag-reducing agent projectOil · AB/BCUnder construction90 kb/d
Westshore Terminals potash facility (for BHP Jansen)Potash · BCUnder construction4.5 Mtpa
Woodfibre LNGLNG · BCUnder construction2.1 Mtpa
Ksi Lisims LNGLNG · BCApproved12 Mtpa
Roberts Bank Terminal 2Port · BCApproved2,400,000 TEU/yr
Pacific Link (West Coast oil pipeline)Oil · AB/BCListed as a national-interest project1,000 kb/d
Grays Bay Road and PortCritical minerals · NUReferred for fast-tracking–
Labrador Trough Corridor strategy (Sept-Îles)Iron ore · QC/NLReferred for fast-tracking–
Port of Churchill Plus strategy (incl. LNG idea)Several · MBReferred for fast-tracking–
Prince Rupert Gas Transmission (PRGT) pipeline for Ksi Lisims LNGGas · BCReferred for fast-tracking–
Northern Gateway pipelines (Enbridge)Oil · AB/BCCancelled525 kb/d oil westbound

Mixed: Can go more than one way.

ProjectWhatStageCapacity
McIlvenna Bay copper mineCritical minerals · SKIn service–
Trans Mountain (TMX), existing systemOil · AB/BCIn service890 kb/d
Westcoast gas pipeline (Enbridge)Gas · BCIn service1.71 Bcf/d
BHP Jansen potash minePotash · SKUnder construction8.5 Mtpa
Denison Wheeler River (Phoenix ISR) uranium projectUranium · SKUnder construction8.4 Mlb U3O8/yr
NexGen Rook I uranium mineUranium · SKUnder construction30 Mlb U3O8/yr
Nouveau Monde Graphite: Matawinie mine and Bécancour plantCritical minerals · QCUnder construction106 kt/yr graphite concentrate
Stablex Cell 6 hazardous-waste landfill (Blainville)Other · QCUnder construction8 million m3 disposal volume
Crawford nickel projectCritical minerals · ONApproved–
Eskay Creek gold-silver mine (Skeena Gold and Silver)Other · BCApproved–
Kudz Ze Kayah zinc mineCritical minerals · YTApproved–
Red Chris mine expansionCritical minerals · BCApproved–
Sisson tungsten projectCritical minerals · NBApproved–
Enbridge Line 5 (Straits of Mackinac tunnel)OilProposed540 kb/d
La Loutre graphite project (Lomiko Metals)Critical minerals · QCProposed77 kt/yr graphite concentrate
NICO cobalt-bismuth-copper-gold project and Alberta refinery (Fortune Minerals)Critical minerals · NT/ABProposed–
Nutrien potash export terminal, Longview WA (US port)Potash · WA (US)Proposed5.5 Mtpa
Teck Trail germanium, gallium and antimony expansionCritical minerals · BCProposed–
Energy East pipeline (TransCanada)Oil · AB/SK/MB/ON/QC/NBCancelled1,100 kb/d
Prosper Petroleum Rigel oil sands projectOil · ABCancelled10 kb/d bitumen

Domestic: Serves Canada itself.

ProjectWhatStageCapacity
Pembina Gas Infrastructure (PGI)Gas · AB/BCIn service–
Darlington SMR (first unit)Electricity · ONUnder construction–
Marten Falls Community Access Road (Ring of Fire)Road · ONUnder construction–
North Coast Transmission Line (BC)Electricity · BCUnder construction–
Webequie Supply Road (Ring of Fire)Road · ONUnder construction–
Iqaluit hydro projectElectricity · NUReferred for fast-tracking–
Mackenzie Valley HighwayRoad · NTReferred for fast-tracking–
NWMO deep geological repository (Ignace / Wabigoon Lake Ojibway Nation)Other · ONReferred for fast-tracking–
Churchill Falls upgrades / Gull IslandElectricity · NL/QCProposed3,975 MW
Churchill Falls–Labrador West transmission lineElectricity · NLProposed–
Labrador 2,000 MW wind project (DCIA feasibility study)Electricity · NLProposed2,000 MW
Northern Road Link (Ring of Fire)Road · ONProposed–
Northern Shield Energy CorridorOil · AB/SK/MB/ONProposed–