Who wins, who pays, part 1

The forecast

Canada is selling more of its resources abroad, and the US is still getting more. Why we expect both to continue, and how sure we are.

By W.F.Published Updated 30 min readSources and method

Updated since publication: 6 corrections, 20 updates

Also in French: La prévision

Correction. When we published this forecast, we put about 81% on "both sides win". That figure counted only the US side: whether more Canadian resources reach the US. What Canada nets has since counted Canada's side: Canada comes out ahead if its resource gains since 2024 outweigh what the tariffs cost it. Counting the US side by supply and Canada's side by income, the forecast comes out about the same, around 83%, if today's tariffs fade the way past US tariffs did, and about 7% if they never end. Either way, the war years leave Canada behind over the decade. The forecast keeps its name; its test now has two parts, and the corrections log has the old wording.

Canada's crude exports to buyers outside the United States more than tripled in two years, from about 126,000 barrels a day in 2023 to about 445,000 in 2025, after the Trans Mountain pipeline to the Pacific coast nearly tripled in capacity in May 2024.1 Oil going to the US still grew, from about 3.87 to about 3.95 million barrels a day (down from about 4.06 million in 2024).234

Canada sold more elsewhere, and the US still got more. Our main forecast has two sides. The US side is that this holds for the next decade, carried by oil, gas, uranium and potash, with metals roughly holding their ground. Canada's side is that Canada comes out ahead too: its resource gains since 2024 outweigh what the tariffs cost it. The US side is a forecast with published odds, which we will score in public; Canada's side is shown as our model's estimates, because no public figure in 2034 will settle it. Neither is a claim that Washington designed any of this.

Chart · kb/d
Canada crude oil exports, thousand barrels a day (annual)the USother countries

How to read this: One bar per period, starting at zero, so heights compare directly. Series are grouped side by side within each period, in legend order. Hover a point or bar for its exact period and value.

the USother countries02,0004,0006,000kb/d2019Canada crude oil exports to the US, thousand barrels a day (annual) · 2019 · 3,663 kb/dCanada crude oil exports to other countries, thousand barrels a day (annual) · 2019 · 95.0 kb/d2020Canada crude oil exports to the US, thousand barrels a day (annual) · 2020 · 3,543 kb/dCanada crude oil exports to other countries, thousand barrels a day (annual) · 2020 · 132 kb/d2021Canada crude oil exports to the US, thousand barrels a day (annual) · 2021 · 3,676 kb/dCanada crude oil exports to other countries, thousand barrels a day (annual) · 2021 · 96.0 kb/d2022Canada crude oil exports to the US, thousand barrels a day (annual) · 2022 · 3,776 kb/dCanada crude oil exports to other countries, thousand barrels a day (annual) · 2022 · 102 kb/d2023Canada crude oil exports to the US, thousand barrels a day (annual) · 2023 · 3,869 kb/dCanada crude oil exports to other countries, thousand barrels a day (annual) · 2023 · 126 kb/d2024Canada crude oil exports to the US, thousand barrels a day (annual) · 2024 · 4,065 kb/dCanada crude oil exports to other countries, thousand barrels a day (annual) · 2024 · 173 kb/d2025Canada crude oil exports to the US, thousand barrels a day (annual) · 2025 · 3,947 kb/dCanada crude oil exports to other countries, thousand barrels a day (annual) · 2025 · 445 kb/d
At a glance Details
The forecast "Both sides win": in 2034, clearly more Canadian resources reach the US than in 2024, by more than ordinary yearly swings, and Canada comes out ahead: its resource gains since 2024 outweigh what the tariffs cost it
The odds, US side About 85%, from our volume model
Canada's side, in our model Ahead in 2034 unless about 57% of today's tariff damage is still in place: in 98% of runs if the tariffs fade the way past US tariffs did, about 9% if they never end. Behind over 2025 to 2034 as a whole in most runs
Both sides (US by supply, Canada by income) About 83% if the tariffs fade the way past US tariffs did; about 7% if they never end (corrected: we first gave about 81% for the US side alone)
The main risks US side: new pipe to the coast outgrowing new oil production. Canada's side: tariffs that last
What we watch Investment under the new laws, a stalled build-out, BC's October 24 election, the next pipeline south, how long the tariffs last and any deal

What "both sides win" means

The US gets more energy, and more secure energy. Canada provided 63.4% of America's crude oil imports in 2025 and close to all of its natural gas imports,5 and 56% of its aluminum imports from 2021 to 2024.6 We expect the build-out under way to add to those flows, not divert them.

Canada gets a bigger resource base and the ability to sell elsewhere, through new pipelines, ports and LNG terminals on its coasts, net of what it pays for them. Its aluminum has shown how: under US tariffs in 2025, about 470,000 tonnes went to the Netherlands and Italy, up from about 95,000 in 2024.7

Why the trade war matters

For a decade before 2025, Canada's big export projects kept dying on paper.

  • Northern Gateway, to the BC coast: approved by Ottawa in 2014, approval quashed by a court in 2016,8 killed by the Trudeau government that November.9
  • Energy East, to the Atlantic: dropped in 2017.10
  • Teck's Frontier oil sands mine: withdrawn in 2020, Teck saying the framework investors wanted, one reconciling resource development and climate change, "does not yet exist here today".11
  • Keystone XL: dead in 2021, after Washington revoked its permit.12
  • Trans Mountain: went ahead only after its owner stopped spending and Ottawa bought it, in 2018.1314

Then came the tariffs, on February 1, 2025. A week later, the US energy secretary said "it's hard to build new pipeline capacity" in Canada.15

Event · 2025-02-01 · action · USExecutive Order 14193 imposes a 25% tariff on Canadian goods and 10% on Canadian energy, citing "the failure of Canada to do more" on drugs

President Trump signed Executive Order 14193 on 1 February 2025 under the International Emergency Economic Powers Act (IEEPA). The order said "the failure of Canada to do more" to intercept drug traffickers and drugs, fentanyl among them, was an "unusual and extraordinary threat" to the United States, and set an additional 25% duty on Canadian goods and 10% on Canadian energy from 4 February. On 3 February the tariffs were paused for 30 days; they took effect on 4 March 2025.

Event · 2025-02-07 · statement · USEnergy Secretary Wright, asked on CNBC whether Canada could ship its oil west to sell overseas, says new pipeline capacity is hard to build and the existing West Coast route is small

Asked earlier in the interview what tariffs would do to oil prices, Wright said the Canadian energy system is integrated with the US one, with pipelines feeding US refineries tuned for heavy Canadian crude, and "I don't think we're going to see that change"; "As the President has said, this is a drug war." When CNBC's Brian Sullivan then asked whether Canada might answer tariffs by shipping its oil "to Vancouver" to sell overseas, Wright replied: "It's hard to build new pipeline capacity. Canada does have a West Coast pipeline, which is running today and exporting oil to Asia, but that's that's 10% or less than 10% of Canadian oil production."

Within five months, three fast-track laws passed: British Columbia's Infrastructure Projects Act (Bill 15 (BC)), Ontario's Protect Ontario by Unleashing our Economy Act (Bill 5 (ON)) and Parliament's One Canadian Economy Act (incl. Building Canada Act) (C-5), which aims to cut decisions on major projects "from five years down to two years".16 Prime Minister Carney called it "tailor-made to respond to this pivotal moment".17 A federal Major Projects Office opened in August,18 and Building Canada Strong Act (C-39), a follow-up bill, was introduced in September 2026.

Event · 2025-06-26 · action · CABill C-5, the One Canadian Economy Act, including the Building Canada Act for national-interest projects, receives Royal Assent

Bill C-5, the One Canadian Economy Act, received Royal Assent on 26 June 2025, less than three weeks after it was introduced on 6 June. It enacted two laws: the Free Trade and Labour Mobility in Canada Act, which removes federal barriers to trade and labour mobility between provinces, and the Building Canada Act, which came into force the same day. The Building Canada Act lets cabinet list projects it considers in the national interest; for those projects, the findings needed for federal approvals are deemed to be made in the project's favour, the minister can issue a single document that stands for the specified federal authorizations, and cabinet can by regulation exempt them from provisions of the federal laws listed in the Act. The government said a new Major Projects Office would lead the work.

The trade war didn't start the build-out. Trans Mountain's expansion entered service in May 2024,19 LNG Canada's investment decision dates from 2018,20 and the fight over approvals is older: in 2023 the Supreme Court found most of the 2019 federal review law unconstitutional.21 An April 2025 election, which kept the Liberals in power under a new leader, fell in the same months, so the tariffs are not the only possible cause. What changed after February 2025 is the pace and the politics.

Event · 2025-04-28 · action · CAFederal election: Carney's Liberals win 169 of 343 seats, three short of a majority, after a campaign dominated by Trump's tariffs and annexation talk

Canadians voted on 28 April 2025 in a snap election called by Prime Minister Mark Carney. Final results published by Elections Canada on 23 May, after validations and judicial recounts, gave the Liberals 169 of 343 seats, three short of a majority, and the Conservatives 144, the UK House of Commons Library reported. Carney campaigned as the leader best placed to deal with President Trump, who had imposed tariffs on Canada and talked of annexing it, and for many voters the election became a referendum on who could stand up to him. The hockey phrase "elbows up" had become a popular rallying cry for resisting the US, ABC News noted.

Documented by

Why we count barrels, not shares

By volume, the US share of Canada's crude exports fell from about 97% to about 90% between 2023 and 2025, while the volume going south rose. So we measure what the US actually receives: the volume reaching it.

Rung What happens Our odds (US side)
O0 Canada's resource build-out does not speed up meaningfully 15% for O0 and O1 together
O1 It speeds up, but the extra output goes mostly to other buyers; the volume to the US stays flat or falls
O2 It speeds up, and the volume to the US grows, even if the US share of Canada's exports falls 62%
O3 As O2, plus locked-in preferential terms for the US: a government supply guarantee or right of first refusal, or a US government stake, purchase contract or price floor of US$100 million or more in a project in Canada 23%

The US side of "both sides win" means O2 or higher: about 85%. That is the figure from the journal's own volume model, below, and it is checked in 2034 against 2024. O2 counts only if the yearly value of Canadian resources reaching the US is more than about US$4 billion above 2024, about 3% of that year's total, so that ordinary year-to-year swings don't count. Prices are held fixed, so a price rise never counts either. It is not, on its own, the chance that both sides win. We first presented it as if it were; Canada's side is under "Net of Canada's costs", below.

The 23% for O3 comes from a second model, described below, because the volume model can't see contract terms. The odds table counts O2 as "this level or higher", so its 85% includes the 23% for O3.

Current odds · outcome

These odds come from our models, whose rules are written down before they run; each row is the result of its model’s current official run. Rows can overlap (an “or higher” row includes the rows above it).

CodeExplanationOddsRangeAs of
O0No meaningful speed-upno estimate
O1Faster, but the extra output goes mostly elsewhereno estimate
O2Faster, and more volume reaches the US (this level or higher)85%2026-10-22
O3Locked-in preferential terms for the US23%7%–39%2026-10-22

O0 and O1 together: 15% (what is left over). These odds measure the US side only, how much reaches the US; they say nothing about whether Canada comes out ahead. Canada's side is under "Net of Canada's costs", below.

What the model says

It asks one question: by the mid-2030s, is the yearly value of Canadian oil, gas, power, uranium, potash and metals reaching the US more than about US$4 billion above 2024? For each project that adds capacity, it draws whether the project gets built (odds set by its stage), adds up what reaches the US, and repeats this 20,000 times, drawing every uncertain input from a sourced range.

It gives O2 or higher in about 85% of those futures, with a median of US$9.1 billion a year more than in 2024 (one run in ten below US$2.3 billion, one in ten above US$14.7 billion). Without metals: about 87% and US$9.6 billion.

The bar is US$4 billion. Growth has to clear US$4 billion a year, so small gains don't count. LNG Canada's Phase 2, approved on September 29 and now under construction, trims the gas figure, because the model assumes a quarter of the gas for new LNG would otherwise have gone to the US. Oil carries most of the gain:

Commodity Adds a year, US$
Oil about 6.0 billion
Gas 2.2 billion
Power about nothing
Uranium 1.0 billion
Potash 0.44 billion
Metals about -0.1 billion

Each row is that commodity's own median; medians don't add up to the total's.

Oil is a race between new production and new pipe to the coast. The regulator's range for western Canada runs from 81,000 to 872,000 extra barrels a day by 2034, with 451,000 in its central case.22 When new coast pipe outgrows new production, barrels are pulled away from US buyers: about one run in seven.

Power adds about nothing, like for like. Two new lines to New England and New York are running, but they only make up for sales Hydro-Québec is losing elsewhere: in a year of normal rain and snow, the regulator puts Canada's electricity exports at about 59 terawatt-hours in 2024 and about 57 in 2034.22 We don't forecast rain and snow, so we compare a normal year with a normal year.

One caveat. 2024 was in fact a drought year: Canada exported only about 36 terawatt-hours, against 60 to 73 a year from 2015 to 2022.23 Growth measured from there would mostly be water coming back, not building, so we don't count it. But if 2034 is a normal year, the check in 2034 will make electricity look about US$2 billion a year better than our model does, for reasons that have nothing to do with building.

Metals add a little, and mostly go elsewhere. New nickel, cobalt, lithium, graphite, copper, zinc, rare earths and tungsten add about US$1.0 billion a year for the US, out of about US$4.2 billion of new output. The rest goes to buyers in Asia and Europe, processors in Canada, Volkswagen's battery arm24 and Ottawa, which has agreed to buy graphite for a stockpile.25

The US share mostly goes where the US paid for it: Ford's lithium,26 GM's graphite,27 rare-earth metal for US defence suppliers,28 and a cobalt refinery and a tungsten mine with Pentagon awards.2930

Aluminum is the one metal the tariffs hit. In 2024, Canada sent 94% of its unwrought aluminum exports to the US. After US tariffs of 25%, then 50%, in 2025,31 shipments south fell by more than a quarter.7 Other countries made up only about a quarter of the shortfall in US imports,3233 and US buyers paid more, not less: in the second quarter of 2026, a Midwest premium of about US$2,500 a tonne over the London price, against about US$580 in Europe.34

Event · 2025-06-04 · action · USUS Section 232 tariffs on steel and aluminum double from 25% to 50% on 4 June 2025 for all countries except the UK

President Trump's Proclamation 10947, signed on 3 June 2025, raised the Section 232 tariffs on steel, aluminum and their derivative products from 25% to 50% from 12:01 a.m. on 4 June 2025. Imports from the United Kingdom stayed at 25% under the US-UK trade deal of May 2025, with the rate open to adjustment from 9 July. Canadian steel and aluminum were subject to the full 50%.

Documented by

How much comes back depends on the deal Canada gets. The last time the US lifted an aluminum tariff for Canada, in May 2019,35 imports from Canada rose from about 140,000 tonnes a month to about 200,000 for the rest of the year, and by 2021 were above their level before the tariff.36 What would bring most Canadian metal back is a better deal (a full exemption, as in 2019, or at least a lower rate), not the end of the tariff.

Some won't come back. A 750,000-tonne smelter is planned in Oklahoma,34 and a July 2026 proclamation lets companies that build US smelters import as much metal as their new plant will make, at half the tariff.37 That discount was first offered in October 2025, only to Canadian and Mexican steel and aluminum makers that committed to new US capacity: tariff relief for American plants.38 The quota also tells us Washington expects its aluminum tariff on other countries to last.

So our central case weighs three possible settlements. In August 2026, the US reportedly offered to cut its 50% tariff on Canadian aluminum to 25%, with quotas on products made from it.39

Aluminum settlement Our weight O2 or higher Median, more a year to the US
Full exemption, as in 2019 (the good case) 45% about 89% US$10.0 billion
A deal at 25% 30% about 86%
The 50% lasts into the 2030s 25% about 76% US$7.2 billion

Weighed that way, aluminum's typical loss to the US is about US$1.1 billion a year and other metals' typical gain about US$1.0 billion. Because aluminum's loss can be much larger (one run in ten above US$3.6 billion), metals on average take about US$0.50 billion a year off the total and lower the median from US$9.6 billion to US$9.1 billion. More still reaches the US.

Even if metals lose ground, the US side barely changes. Counting oil and other energy, more still reaches the US, and metal follows demand: if US demand outgrows what US smelters and other suppliers can cover, Canadian metal can come back fast.

The model's limits. The odds that a project gets built are only partly drawn from history: for an approved or postponed project they come from our count of past Canadian resource and energy projects (how many of those at that stage since 2014 were in service within eight years), and a project listed as of national interest gets the approved odds; for the other stages they are our judgment. So is the aluminum settlement, and with it how much metal returns to the US, which is why we show each one. Prices only serve to add different commodities together, so a price rise never counts as growth. Gold and silver (traded as bullion) and iron ore (almost all shipped overseas) are left out. And the model can't see contract terms, so it says nothing about O3.

The US$4 billion bar comes from history. It is about how much the same fixed-price total moves between two single years for ordinary reasons (fires, droughts, slow years), measured from 2010 to 2025. A higher bar would lower the odds: at US$8 billion, about 60%.

Where things stand today

1. The southbound capacity is already committed. For less to reach the US, a slowdown wouldn't be enough; it would take a shock.

Most of the model's losing runs (about three in five) have weak production growth and a big new coast pipeline. Neither is in place today: production is still growing, and the proposed Pacific Link (West Coast oil pipeline) has no final investment decision.

The pipeline did move a step closer on October 1, 2026, when the federal government listed it as the first project of national interest under the Building Canada Act. Its conditions are still to be set, but the listing raises the model's odds that it gets built, and more oil to the coast means less growth going south, which lowers the odds of O2 or higher.

Event · 2026-10-01 · action · CACarney lists the West Coast oil pipeline, renamed Pacific Link, as the first project of national interest under Schedule 1 of the Building Canada Act

In Fort McMurray on 1 October 2026, Prime Minister Carney listed the West Coast oil pipeline, now called Pacific Link, as a project of national interest under Schedule 1 of the Building Canada Act, the first project designated this way (CBC). The pipeline would carry about one million barrels a day roughly 1,250 km from Bruderheim, Alberta, to a deepwater port outside Delta, BC (Global News), on a southern route that the government says protects BC's North Coast and the Great Bear Sea. Canada and Alberta are to hold equal shares, Pembina Pipeline is the private investor and Trans Mountain Corporation leads development; Indigenous communities will be offered at least 10% ownership, financed through loan guarantees. The Major Projects Office is to finalize the conditions by 1 September 2027 (Prime Minister's Office). No final investment decision or in-service date was announced.

Event · 2026-07-02 · document · CACanada refers Alberta's West Coast oil pipeline to the Major Projects Office and signs the Pathways agreement with Alberta and oil sands firms

On 2 July 2026 in Calgary, Prime Minister Carney announced that Ottawa would refer the Government of Alberta's proposal for a west coast oil pipeline to the Major Projects Office. The pipeline would carry one million barrels of oil a day, largely along the existing Trans Mountain corridor; Canada and Alberta would be equal partners, with an equity stake reserved for Indigenous Peoples, Trans Mountain Corporation leading development and Pembina Pipeline as a private investor, the Prime Minister's Office said. The same release said Canada, Alberta and the Oil Sands Alliance had reached an agreement to advance the Pathways carbon-capture project. The Canadian Press reported on 13 July that this memorandum of understanding was signed on 2 July and made public on 13 July. In it Alberta agreed to "implement financial supports to encourage the oil production growth required to underpin" the new pipeline, the expansion of Trans Mountain and other growth in export capacity; binding agreements with each company are to be signed by 15 November 2026.

2. The coast side is being built without draining the south. LNG Canada Phase 1 has shipped LNG since mid-2025; Cedar LNG and Woodfibre LNG are under construction; Ksi Lisims LNG is approved; on September 29, 2026, LNG Canada's partners took the final investment decision on Phase 2, two more trains that double the Kitimat plant's capacity to 28 million tonnes a year, with operations expected in the early 2030s;4546 and Trans Mountain drag-reducing agent project adds about 90,000 barrels a day to Trans Mountain without new pipe. The model assumes most of the gas for new LNG comes from new production.

Event · 2025-06-30 · action · CA-BCLNG Canada ships its first cargo from Kitimat, BC, bound for Asia

The tanker GasLog Glasgow left LNG Canada's terminal in Kitimat, BC, on 30 June 2025 with the plant's first cargo, bound for South Korea, CBC reported: Canada's first large-scale LNG export. LNG Canada is a joint venture of Shell, Petronas, PetroChina, Mitsubishi and KOGAS, and its first phase is designed to produce 14 million tonnes a year. The US Energy Information Administration put the two trains' capacity at 1.84 billion cubic feet a day and expected the plant to reach full capacity in 2026. Until then, Canada's only export market for its gas had been the United States, by pipeline.

Event · 2026-09-29 · action · CA-BCLNG Canada's partners take the final investment decision on Phase 2, to double the Kitimat plant's capacity to 28 million tonnes a year

LNG Canada announced that its five joint-venture partners, Shell (40%), PETRONAS (25%), PetroChina (15%), Mitsubishi Corporation (15%) and KOGAS (5%), had taken the final investment decision on the Phase 2 expansion of its plant at Kitimat, BC. LNG Canada's release is dated 28 September 2026; the Prime Minister's Office, Shell and TC Energy announced the decision on 29 September. Phase 2 adds two LNG processing units (trains), raising the plant's capacity from 14 to 28 million tonnes a year; Shell said commercial operations are expected to begin in the early 2030s. The Prime Minister's Office and the federal Major Projects Office put the investment at $33 billion, and the Prime Minister's Office, in the title of its release, called it the second-largest single private investment in Canadian history; LNG Canada described it as one of the largest private-sector investments in Canada. The decision lets MNT Investments LP, representing the Gitga'at, Gitxaała, Haisla, Kitselas and Kitsumkalum Nations, exercise an option to invest up to C$1 billion in a special-purpose entity that will buy Phase 2's new LNG storage tank; the Prime Minister's Office and the Major Projects Office describe this as a majority ownership stake in the tank but give different sizes for it (225,000 cubic metres in the Prime Minister's Office release, 255,000 on the Major Projects Office page). Each partner remains responsible for taking its own share of the LNG produced (equity lifting); the releases name no third-party buyers. TC Energy said the decision met the conditions of its earlier conditional investment decision on Coastal GasLink Phase 2, which adds compressor stations (five, according to LNG Canada) to nearly double the pipeline's current capacity of about 2.1 billion cubic feet a day; the Prime Minister's Office says the capacity will double. TC Energy expects construction to start in early 2027 and service to begin in the early 2030s.

3. Locked-in terms were asked for, and refused so far. In the August talks, Washington reportedly asked for a right of first refusal on Canadian critical minerals;47 Prime Minister Carney named it among the demands Canada refused when he walked away.48

Event · 2026-08-14 · statement · USReported US ask in the August 2026 trade talks: a right of first refusal on Canadian critical minerals

Caution: anonymous sources First reported by The Globe and Mail citing unnamed sources; neither government confirmed the details. Reported by an outlet citing unnamed sources.

First reported by The Globe and Mail on 2026-08-14, citing unnamed sources. S&P Global Platts, in a free relay by Hellenic Shipping News (2026-08-20), wrote: 'Among reported US demands is a right of first refusal (ROFR) on Canadian minerals, or at least preferential access to them, according to media reports citing unnamed sources'; neither government confirmed details. Investing News and NetNewsLedger also reported the ask. After the talks broke down, Carney told a news conference on 2026-08-22 that Canada 'would never give exclusive access' to critical minerals (Canadian Press), and a Canadian Press fact check says he highlighted US demands to 'grant a right-of-first-refusal to Canada's critical mineral exports'. Claims that the minerals would be sold 'at capped prices' with 'priority access' to oil, gas, nuclear and hydro come from an unsourced viral list that the Canadian Press fact check could not confirm. No credible source gives terms (which minerals, price or duration).

Event · 2026-08-21 · statement · CACarney walks away from the tentative deal after late US demands on autos, culture and Canada's other trade deals

Caution: self-reported The late US demands are described in Carney's own account; US Trade Representative Greer blamed new Canadian demands instead. The precise terms of the final US offer are not public. Only one side’s own account of itself.

Talks on the tentative Canada-US deal unravelled on the evening of Friday 21 August 2026, and Prime Minister Carney announced early on Saturday 22 August that he had told Canada's negotiators to walk away; the US 50% tariffs took effect at 12:01 a.m. that day, CBC News reported. Carney said the US had added late demands on autos, including exempting some vehicles from tariffs but not others, on Canada's support for French-language culture and media and on bilingual labelling, and, "in the last hours," language to restrict Canada's ability to have other trade deals. "We cannot accept what they've offered, and we will not give what they've asked," he said.

Nothing is locked in. The US declined to renew the continental trade agreement in its current form, putting it under yearly reviews, though a bigger renegotiation stays possible.4950 The US wants the top rung, and Canada has so far said no.

Our 23% for O3 comes from a count. We looked at the US's dealings with its closest resource partners (Canada, Mexico, Japan, Australia and the EU) since 2017, nearly 49 partner-years, and counted the deals that lock in terms of this kind. Then we adjusted for what is different now: yearly reviews of the trade agreement, Canada's refusal in August, and Washington's new practice of taking stakes in mining and processing projects. That gives about 27% that terms of this kind are in force in 2034. O3 also needs O2, so we combine it with O2's 85%, treating the two as independent: about 23%.

The count is thin. Only one deal meets our bar: a US$174 million stake by the US Department of War in a gallium plant in Australia, announced in September 2026.51 So the range is wide, from about 7% to 39%, and counting only the period since January 2025 would raise it to about 65%. It is checked in 2034, with the rest of the forecast.

What counts as "locked in" changes the answer, so we show three bars. We use the middle one. A strict bar, counting only a government supply guarantee, a right of first refusal or priority access, gives about 4%. The middle bar adds US government stakes, purchase contracts or price floors of US$100 million or more in a project in Canada: 23%. A broad bar, adding any binding clause in a trade agreement that favours US buyers of Canadian resources, gives about 36%.

Net of Canada's costs

Canada's side of the win isn't free: tariffs on its other exports, public money and tax breaks such as the proposed Productivity Mega Deduction, faster reviews that critics say cut consultation short, and environmental and legal risk. When we published this forecast, we said Canada still comes out ahead, before setting those costs against its gains. Who pays sets out who carries them; What Canada nets adds up the ones our model can price. Canada comes out ahead if its resource gains since 2024 outweigh what the tariffs cost it, and for 2034 that turns on how much of today's tariff damage is still in place:

Tariff damage still in place in 2034 Canada ahead in 2034, in our model Both sides (US by supply, Canada by income)
None: the trade war is over 100% About 85%
About a quarter: today's tariffs fade the way past US tariffs did 98% About 83%
Half 62% About 50%
All of it: the tariffs never end 9% About 7%

Canada comes out ahead in 2034 unless about 57% of the damage is still in place. The decade is a different count: added up from 2025 to 2034, the war years leave Canada behind in 95% of our runs, typically by about C$89 billion, and the longer the tariffs last, the less of it comes back. Canada's side is given as our model's estimates by tariff condition rather than odds, because no public figure in 2034 will settle it: the tariff damage will still be an estimate. Faster reviews and legal risk are not in the count, and emissions sit beside it.

What we now expect: the build-out pays for both countries; the trade war doesn't. The US gets more Canadian supply either way; counted as income, the trade war costs Americans more than the build-out adds. By 2034, Canada comes out ahead unless most of today's tariffs are still in place; but the decade as a whole leaves it behind, and the longer the tariffs last, the less of it comes back.

What would change the forecast

Whether money follows the new laws. If C-39 and the tax deduction pass, do investors commit? One sign would be Enbridge reviving the second phase of its expansion, another 250,000 barrels a day south, postponed in July.52

Event · 2026-07-31 · action · CAEnbridge postpones Mainline Optimization Phase 2 (+250,000 barrels a day, Alberta to North Dakota) because producers won't commit

Enbridge said Canadian oil producers had not committed to the 250,000-barrel-a-day second phase. Coverage cited oil-price volatility since the start of the Iran war and the fact that the federal–Alberta energy agreement remains non-binding. Phase 1 (about 150,000 barrels a day) reached a final investment decision in November 2025.

Pre-registered prediction P4 · open · registered 2026-09-26Capital follows the law

Window: A = the later of two dates: the Royal Assent of Bill C-39 and the Royal Assent of the bill containing the Productivity Mega Deduction; window A to A+12 months. What counts: The claim: Canada's investment gap was a permitting discount, not a geology discount. If so, committed capital rises noticeably within 12 months of A for projects on the investment summit's 167-project list. "Committed" means final investment decisions, signed financing and allocations of funds to specific projects, not announcements. Supported if commitments cluster after Royal Assent and investors cite the law. …

Whether the build-out stalls. If C-39 or the deduction is defeated or gutted, or a flagship project stops, the odds of O2 fall.

Pre-registered prediction P5 · open · registered 2026-09-27Pressure returns if the build-out stalls

Window: Stall event (C-39 defeated/gutted, Mega Deduction withdrawn or cut back, flagship project stops); window 90 days after it becomes public. What counts: The question: if Canada's resource build-out stalls, does US pressure come back within 90 days, timed to the stall? What counts as a hit: in the 90 days after a stall becomes public, the US applies new or renewed pressure on Canada: new tariffs or threats, talks broken off, or a pending deal slowed or reversed. The pressure must be timed to the stall, not to an act of Canadian defiance. A hit supports the foresight …

How long the tariffs last. For Canada's side, nothing matters more. With today's tariffs otherwise kept, a lasting deal that removes a little over a third of today's damage puts Canada ahead in half our model's runs; the tentative deal of August 2026 would have removed about half. The sooner the war ends, the more of the decade's losses come back.

British Columbia after its October 24 election. Most coast-bound capacity, Canada's half of the win and the one thing that can pull barrels away from the US, would be built there. The province's fast-track law is passed but mostly not in force.

Event · 2026-10-24 · action · CA-BCBritish Columbia general election, polling day (scheduled)

Scheduled; result pending. Early polls were split: Angus Reid Institute (online, 2026-09-22 to 24) had the Conservatives at 43% and the NDP at 35% among decided and leaning voters; Liaison Strategies (IVR, 2026-09-21 to 22) had the NDP at 41% and the Conservatives at 36%. In the Angus Reid survey, 15% named US tariffs, Donald Trump or the alcohol ban as a top issue.

Pre-registered prediction P8 · open · registered 2026-09-27BC Bill 15 switched on within 12 months of the 2026-10-24 election

Window: 2026-10-24 to 2027-10-24. What counts: The question: within 12 months of the BC election of 24 October 2026 (that is, by 24 October 2027), are the fast-track powers in BC's Bill 15 (sections 1 and 3 to 47) switched on, and are they used? If a Conservative government wins, we record whether it switches Bill 15 on, amends it or repeals it. What counts as a hit: a cabinet order (an order in council) brings sections 1 and 3 to 47 into force by 24 October …

The next big southbound pipeline. South Bow has 20-year commitments from nine shippers for 465,000 barrels a day to the US on its Prairie Connector (South Bow / Bridger, partial Keystone XL revival), with a decision targeted for mid-2027.53

Who buys the second wave. If most of the new coast output lands outside the US while southbound flows stall, that is O1, and the US side of this forecast is wrong. Metals already look partly like that: most new mine output is sold outside the US. Oil and gas are what keep the total above 2024.

We will update both sides when these move, and say why.

Sources

  1. Canada Energy Regulator, “Market Snapshot: Oil pipeline throughputs remained high in 2025”, 2026-06-24. ↩
  2. Canada Energy Regulator, “CER Commodity Statistics: Crude Oil - Summary Export by Destination, monthly, light, medium and heavy, m3/d by PADD I-V and Other, January 2019 to December 2024”, 2026-10-19. ↩
  3. Canada Energy Regulator, “CER Commodity Statistics: Crude Oil - Summary Export by Destination, monthly, light, medium and heavy, m3/d by PADD I-V and Other, January 2024 to July 2026”, 2026-10-19. ↩
  4. US Energy Information Administration, “U.S. Imports from Canada of Crude Oil (thousand barrels per day), series MCRIMUSCA2”, 2026-08-31. ↩
  5. Canada Energy Regulator, “Market Snapshot: Overview of 2025 Canada-U.S. Energy Trade”, 2026-05-27. ↩
  6. U.S. Geological Survey, “Mineral Commodity Summaries 2026: Aluminum”, 2026-02. ↩
  7. Statistics Canada, “Canadian International Merchandise Trade (CIMT) database: domestic exports by HS6 product, destination and province of origin, customs basis (data to July 2026)”, 2026-09. ↩ ↩
  8. Federal Court of Appeal, “Gitxaala Nation v. Canada, 2016 FCA 187”, 2016-06-23. ↩
  9. Prime Minister of Canada, “Prime Minister Justin Trudeau's pipeline announcement”, 2016-11-29. ↩
  10. TransCanada (TC Energy), “TransCanada Announces Termination of Energy East Pipeline and Eastern Mainline Projects”, 2017-10-05. ↩
  11. Teck Resources, “Letter from Teck CEO Don Lindsay to Environment Minister Jonathan Wilkinson withdrawing the Frontier project”, 2020-02-23. ↩
  12. TC Energy, “TC Energy confirms termination of Keystone XL Pipeline Project”, 2021-06-09. ↩
  13. Kinder Morgan Canada (via Canada Newswire), “Kinder Morgan Canada Limited Suspends Non-Essential Spending on Trans Mountain Expansion Project”, 2018-04-08. ↩
  14. Department of Finance Canada, “Agreement Reached to Create and Protect Jobs, Build Trans Mountain Expansion Project (speech by Finance Minister Bill Morneau)”, 2018-05-29. ↩
  15. CNBC, “CNBC transcript: Energy Secretary Chris Wright on Squawk on the Street”, 2025-02-07. ↩
  16. Intergovernmental Affairs, Government of Canada, “Government of Canada introduces legislation to build One Canadian Economy”, 2025-06-06. ↩
  17. Prime Minister of Canada, “Prime Minister Carney delivers remarks following the passage of the One Canadian Economy Act in the House of Commons”, 2025-06-20. ↩
  18. Prime Minister of Canada, “Prime Minister Carney launches new Major Projects Office to fast-track nation-building projects”, 2025-08-29. ↩
  19. Canada Development Investment Corporation (CDEV), “Trans Mountain Announces Milestones of Commercial Service for Expanded System”, 2024-05-01. ↩
  20. LNG Canada, “LNG Canada Announces a Positive Final Investment Decision”, 2018-10-01. ↩
  21. Supreme Court of Canada, “Case in Brief: Reference re Impact Assessment Act, 2023 SCC 23”, 2023-10-13. ↩
  22. Canada Energy Regulator, “Canada's Energy Future 2026: data (crude oil production, natural gas production, electricity interchange, benchmark prices)”, 2026. ↩ ↩
  23. Canada Energy Regulator, “Electricity Trade Summary: figure data (annual exports and imports, MW.h and C$)”, 2026-09-25. ↩
  24. PMET Resources, “PMET Resources Delivers Positive CV5 Lithium-Only Feasibility Study for its Large-Scale Shaakichiuwaanaan Project”, 2025-10-20. ↩
  25. Nouveau Monde Graphite, “NMG and Government of Canada Execute Updated Binding Offtake and Marketing Framework for Matawinie Graphite”, 2026-03-26. ↩
  26. Nemaska Lithium (CNW), “Ford and Nemaska Lithium enter long-term lithium hydroxide supply agreement”, 2023-05-22. ↩
  27. Vianode, “Vianode signs USD multi-billion long-term supply agreement for EV battery-grade anode graphite with GM”, 2025-01-15. ↩
  28. Government of Saskatchewan, “Saskatchewan Research Council and REalloys Sign Historic Rare Earth Partnership Agreements”, 2025-12-08. ↩
  29. Electra Battery Materials, “Electra Battery Materials Corporation, Annual Report on Form 20-F for the fiscal year ended December 31, 2025”, 2026. ↩
  30. Northcliff Resources (CNW), “Northcliff Announces Results of Feasibility Study Update for Sisson Project”, 2026-08-31. ↩
  31. Federal Register (Executive Office of the President), “Proclamation 10947: Adjusting Imports of Aluminum and Steel Into the United States”, 2025-06-03. ↩
  32. U.S. Geological Survey, National Minerals Information Center, “Mineral Industry Surveys: Aluminum in December 2024”, 2025-04. ↩
  33. U.S. Geological Survey, National Minerals Information Center, “Mineral Industry Surveys: Aluminum in December 2025”, 2026-04. ↩
  34. Century Aluminum Company, “Century Aluminum Company, Form 10-Q for the quarter ended June 30, 2026”, 2026-08. ↩ ↩
  35. Federal Register (Executive Office of the President), “Proclamation 9893: Adjusting Imports of Aluminum Into the United States”, 2019-05-19. ↩
  36. United Nations Statistics Division (UN Comtrade; data reported by the US Census Bureau), “UN Comtrade: US imports of unwrought aluminum (HS 7601) by partner, annual 2016-2025 and monthly 2018-2020 and 2025-2026”, 2026-09. ↩
  37. Federal Register (Executive Office of the President), “Proclamation 11045: Further Strengthening Actions Taken To Adjust Imports of Aluminum Into the United States”, 2026-07-20. ↩
  38. Federal Register (Department of Commerce, International Trade Administration), “Procedures for tariff adjustments under Proclamation 10984 for Canadian and Mexican steel and aluminum producers committing new US capacity (Commerce notice)”, 2026-04-23. ↩
  39. CBC, “What we know about how the Canada-U.S. trade talks fell apart”, 2026-08-24. ↩
  40. Enbridge, “Enbridge Adding Canadian Egress to Key U.S. Refining Markets, Enhancing North American Energy Security”, 2025-11-14. ↩
  41. Avangrid, “Avangrid's New England Clean Energy Connect project is complete and energized”, 2026-01-16. ↩
  42. Champlain Hudson Power Express, “The Champlain Hudson Power Express Marks Completion of a Landmark 1,250 MW Energy Infrastructure Project Connecting Québec to New York City”, 2026-06-16. ↩
  43. Denison Mines Corp., “Denison Announces Final Investment Decision for the Phoenix In-Situ Recovery Uranium Mine and Plans to Start Construction in March 2026”, 2026-02-24. ↩
  44. NexGen Energy, “NexGen Announces Doubling of Contracted Sales Volumes with 5 Million Pound Uranium Offtake Contract with Major US Utility”, 2025-08-06. ↩
  45. LNG Canada (via Cision Newswire), “LNG Canada Announces Phase 2 Final Investment Decision”, 2026-09-29. ↩
  46. Shell, “Shell takes final investment decision to double LNG Canada capacity”, 2026-09-29. ↩
  47. Hellenic Shipping News, “US demand for right of first refusal on Canadian minerals 'impossible': experts (syndicated S&P Global Platts copy)”, 2026-08-18. ↩
  48. Lethbridge News Now (Canadian Press), “Fact File: Online users claim to have detailed list of last-minute U.S. trade demands”, 2026-08-25. ↩
  49. Office of the United States Trade Representative, “Ambassador Greer Issues Statement on USMCA Joint Review”, 2026-07-01. ↩
  50. Blakes, “U s declines to renew cusma at first joint review what businesses need to know”. ↩
  51. Semiconductor Today, “US Department of War investing $174m in Alcoa's alumina refinery in Western Australia”, 2026-09-01. ↩
  52. Global News, “Canada's Enbridge postpones plans for second phase of Mainline oil pipeline expansion”, 2026-07-31. ↩
  53. South Bow (GlobeNewswire), “South Bow Reports Second-quarter 2026 Results and Declares Dividend”, 2026-08-05. ↩

Changes since publication

A correction fixes something that was wrong. An update records the world moving: odds revised, a prediction settled, data refreshed. Newest first.

The charts, odds tables and other records embedded in this article always show the current data, so some figures may differ from the day it was published. This list records what changed since then.

  1. UpdateThis article

    Text of the article

    Why: Updated after What the US nets, our count of Americans' income from Canada's build-out and the trade war: the US side is now counted.

    In the corrections log: This article, 22 October 2026

  2. UpdateThis article

    Text of the article
    Summary

    Why: Model limits reworded for rules amendment 3 of our resource-exports model (O2 v1.4, official run 63): the odds that approved and postponed projects get built now come from our study of past Canadian resource and energy projects (share in service within eight years, projects since 2014), under the adoption rule the study fixed before any data were seen; listed projects take the approved odds; the other stages stay judgment; Model figures follow the new official run of the resource-exports model (O2 v1.4, run 63). Rule change (O2 rules amendment 3): the odds that approved and postponed projects get built now come from our study of past Canadian resource and energy projects (share in service within eight years, projects since 2014: 29.3% and 4.3%), under the adoption rule the study fixed before any data were seen; listed and referred projects take the approved odds; Model figures follow the new official run of the locked-in terms model (O3, run 64), which reads the resource-exports model (O2 v1.4, run 63). Rule change (O2 rules amendment 3): the odds that approved and postponed projects get built now come from our study of past Canadian resource and energy projects, under the adoption rule the study fixed before any data were seen; Model figures follow the new official run of Canada's net ledger (CA1, run 65; CA rules amendment 2, which pairs its build draws with O2's), which reads the resource-exports model (O2 v1.4, run 63). Rule change (O2 rules amendment 3): the odds that approved and postponed projects get built now come from our study of past Canadian resource and energy projects (share in service within eight years, projects since 2014: 29.3% and 4.3%), under the adoption rule the study fixed before any data were seen; listed and referred projects take the approved odds

    In the corrections log: This article, 22 October 2026

  3. UpdateO3: Locked-in preferential terms for the US

    Odds
    was22% now23%

    Why: O3 rerun (run 64, replacing run 60) after the O2 rerun under O2 rules amendment 3 (O2 v1.4, run 63), whose stage odds for approved and postponed projects now come from our study of past Canadian resource and energy projects. P(O2) 80.6% -> 84.7%; P(O3) 21.75% -> 22.86% (printed 22% -> 23%); range 6.54-37.40% -> 6.88-39.31% (printed 7% to 37% -> 7% to 39%). The count of comparable US deals is unchanged (27.0%).

    In the corrections log: O3: Locked-in preferential terms for the US, 22 October 2026

  4. UpdateO2: Faster, and more volume reaches the US (this level or higher)

    Odds
    was81% now85%

    Why: O2 rerun under rules amendment 3 (O2 v1.4, official run 63, replacing run 59): the odds that approved and postponed projects get built now come from our study of past Canadian resource and energy projects (share in service within eight years, projects since 2014: 29.3% and 4.3%, drawn with their uncertainty), as the adoption rule the study fixed before any data were seen requires; listed and referred projects move to the approved odds (29.3%). P(O2) 80.6% -> 84.7% (printed 81% -> 85%); median US$8.6 billion -> US$9.1 billion a year; O0 and O1 together 19% -> 15%.

    In the corrections log: O2: Faster, and more volume reaches the US (this level or higher), 22 October 2026

  5. CorrectionThis article

    Summary
    Text of the article

    Why: Correction: the odds we attached to "both sides win" (about 81%) counted only the US side, whether more Canadian resources reach the US. What Canada nets, our model of Canada's gains against its costs, finds that counting the US side by supply and Canada's side by income gives about the same (about 80%) if today's tariffs fade the way past US tariffs did and about 12% if they never end, and that the war years leave Canada behind over the decade either way; the forecast now shows both sides, and the volume model's figures are brought up to its current run.

    In the corrections log: This article, 15 October 2026

  6. UpdateO3: Locked-in preferential terms for the US

    Odds
    was22% now22%

    Why: O3 rerun (run 56, replacing run 49) after the O2 rerun (run 55) that followed LNG Canada Phase 2 moving from final investment decision to under construction: early construction at Kitimat began on 1 October 2026 (The Northern View, 8 October 2026; Fluor release, 29 September 2026; revision 6183). P(O3) 21.79% -> 21.75% (printed 22%, unchanged); range 6.55-37.47% -> 6.54-37.40% (printed 7% to 37%, unchanged).

    In the corrections log: O3: Locked-in preferential terms for the US, 9 October 2026

  7. UpdateThis article

    Text of the article
    Summary

    Why: Model figures follow the new official run of the resource-exports model (O2, run 55). Input change: LNG Canada Phase 2 moved from final investment decision to under construction, with early construction at Kitimat from 1 October 2026 (The Northern View, 8 October 2026; Fluor release, 29 September 2026; revision 6183); Model figures follow the new official run of the locked-in terms model (O3, run 56), which reads the resource-exports model (O2, run 55). Input change: LNG Canada Phase 2 moved from final investment decision to under construction, with early construction at Kitimat from 1 October 2026 (The Northern View, 8 October 2026; Fluor release, 29 September 2026; revision 6183)

    In the corrections log: This article, 9 October 2026

  8. UpdateO2: Faster, and more volume reaches the US (this level or higher)

    Odds
    was81% now81%

    Why: O2 rerun (run 55, replacing run 48) after LNG Canada Phase 2 moved from final investment decision to under construction: early construction at Kitimat began on 1 October 2026 (The Northern View, 8 October 2026; Fluor release, 29 September 2026; revision 6183). P(O2) 80.7% -> 80.6% (printed 81%, unchanged); median US$8.7 billion -> US$8.6 billion a year.

    In the corrections log: O2: Faster, and more volume reaches the US (this level or higher), 9 October 2026

  9. CorrectionO2: Faster, and more volume reaches the US (this level or higher)

    Odds
    was81% now81%

    Why: Correction: the reason now prints the volume model's official run (run 48, the same draws as before): if the 50% aluminum tariff lasts, the model gives 71%; the reason gave about 70%. The odds, 81%, are unchanged.

    In the corrections log: O2: Faster, and more volume reaches the US (this level or higher), 6 October 2026

  10. CorrectionThis article

    Text of the article

    Why: Correction: the aluminum table now prints the volume model's official run. If the 50% tariff lasts into the 2030s, the model gives 71% (it was given as about 70%); the median gain is US$9.6 billion a year with a full exemption and US$6.8 billion if the 50% lasts (given as US$9.4 billion and US$6.6 billion, figures from before the model was rerun on October 6 with four metal projects at their new stages).

    In the corrections log: This article, 6 October 2026

  11. CorrectionThis article

    Text of the article

    Why: Correction: the odds at a higher bar of US$8 billion were given as about 54%; the volume model's official run puts the share of its draws above US$8 billion at about 56% (55.6%), so the sentence now says about 56%.

    In the corrections log: This article, 6 October 2026

  12. UpdateO3: Locked-in preferential terms for the US

    Odds
    was22% now22%

    Why: O3 rerun on the updated volume model (run after four metal projects changed stage in our project table: KSM proposed to approved; North American Lithium expansion stage 1 final investment decision to under construction; Rose lithium-tantalum proposed to approved; Vianode's St. Thomas graphite plant approved to proposed; sources: the 2014 KSM approvals, Elevra FY26 results and NAL expansion prefeasibility study of September 2026, the Rose federal Decision Statement of 2021 and Quebec authorization of 2022, Reuters of September 30, 2026 on Vianode). P(O2) 80.9% -> 80.7%; O3 21.9% -> 21.8%, still 22%; range 7%-38% -> 7%-37%.

    In the corrections log: O3: Locked-in preferential terms for the US, 6 October 2026

  13. UpdateO2: Faster, and more volume reaches the US (this level or higher)

    Odds
    was81% now81%

    Why: The volume model was rerun after four metal projects changed stage in our project table: KSM (Seabridge Gold) proposed to approved (its 2014 federal, B.C. and Nisga'a environmental assessment approvals); North American Lithium expansion, stage 1 (Elevra) final investment decision to under construction (fully funded in May 2026, groundbreaking in June 2026: Elevra FY26 results and NAL expansion prefeasibility study, September 2026); Rose lithium-tantalum (Critical Elements) proposed to approved (federal Decision Statement of 2021, Quebec authorization of 2022, mining lease); Vianode's St. Thomas graphite plant approved to proposed (more funding needed, production now in 2029, no investment decision; Reuters, September 30, 2026). P(O2) 80.9% -> 80.7%, still 81%; median US$8.7 billion a year, unchanged as printed.

    In the corrections log: O2: Faster, and more volume reaches the US (this level or higher), 6 October 2026

  14. UpdateThis article

    Text of the article

    Why: Volume model rerun after four metal projects changed stage in our project table: KSM (Seabridge Gold) proposed to approved (its 2014 federal, B.C. and Nisga'a environmental assessment approvals); North American Lithium expansion, stage 1 (Elevra) final investment decision to under construction (fully funded in May 2026, groundbreaking in June 2026, long-lead equipment ordered: Elevra FY26 results and NAL expansion prefeasibility study, September 2026); Rose lithium-tantalum (Critical Elements) proposed to approved (federal Decision Statement of 2021, amended 2025; Quebec authorization of 2022, amended 2024; mining lease); Vianode's St. Thomas synthetic graphite plant approved to proposed (on September 30, 2026 Vianode said the plant needs more funding and production now starts in 2029; no investment decision; Reuters); The O3 range (the volume model's probability times the p10-p90 range of the locked-in-terms count) goes from 7%-38% to 7%-37% after the volume model was rerun: four metal projects changed stage in our project table: KSM (Seabridge Gold) proposed to approved (its 2014 federal, B.C. and Nisga'a environmental assessment approvals); North American Lithium expansion, stage 1 (Elevra) final investment decision to under construction (fully funded in May 2026, groundbreaking in June 2026: Elevra FY26 results and NAL expansion prefeasibility study, September 2026); Rose lithium-tantalum (Critical Elements) proposed to approved (federal Decision Statement of 2021, Quebec authorization of 2022, mining lease); Vianode's St. Thomas graphite plant approved to proposed (more funding needed, production now in 2029, no investment decision; Reuters, September 30, 2026)

    In the corrections log: This article, 6 October 2026

  15. UpdateThis article

    Summary
    Text of the article

    Why: The forecast's model figures now come from the current runs of the volume model and of the O3 model, which include the federal approval of the Crawford nickel project: O2 or higher, about 80% -> 81%; O2 alone, 58% -> 59%; O0 and O1 together, 20% -> 19%; median US$8.5 billion -> US$8.7 billion a year more than in 2024 (one run in ten below US$1.3 billion, one in ten above US$14.7 billion); without metals, about 82% -> 83% and US$8.7 billion -> US$9.0 billion; oil about US$5.4 billion -> US$5.5 billion, potash US$0.45 billion -> US$0.44 billion; aluminum's loss above US$3.6 billion in one run in ten (was US$3.5 billion), and metals taking about US$0.22 billion a year off the total on average (was US$0.25 billion). O3 is unchanged at 22%.

    In the corrections log: This article, 6 October 2026

  16. UpdateO3: Locked-in preferential terms for the US

    Odds
    was22% now22%

    Why: The reason now gives the main forecast's probability from the volume model's current run, which O3's current run uses: about 80% -> 81%. O3 itself is unchanged at 22% (range 7% to 38%).

    In the corrections log: O3: Locked-in preferential terms for the US, 6 October 2026

  17. UpdateO2: Faster, and more volume reaches the US (this level or higher)

    Odds
    was80% now81%

    Why: The published figure now comes from the volume model's current run, which includes the federal approval of the Crawford nickel project, read under the model's rules amendment that takes each metal project's stage from the project table: O2 or higher, about 80% -> 81%; the two lower rungs together, about 20% -> 19%.

    In the corrections log: O2: Faster, and more volume reaches the US (this level or higher), 6 October 2026

  18. UpdateThis article

    Text of the article

    Why: O3 range updated: the federal approval of the Crawford nickel project (decision statement under the Impact Assessment Act, 31 July 2026), recorded in the project table, now counts in the volume model, which under its rules amendment reads each metal project's stage from that table. The main forecast's probability rises slightly, so O3's range becomes 7% to 38% (was 7% to 37%) and, counting only the period since January 2025, about 62% (was about 61%). O3 stays at about 22%.

    In the corrections log: This article, 6 October 2026

  19. UpdateO3: Locked-in preferential terms for the US

    Odds
    was22% now22%

    Why: O3 range updated: the federal approval of the Crawford nickel project (decision statement under the Impact Assessment Act, 31 July 2026), recorded in the project table, now counts in the volume model, which under its rules amendment reads each metal project's stage from that table. The main forecast's probability rises slightly, so the top of O3's range moves from 37% to 38% (7% to 38%); O3 itself stays at about 22%.

    In the corrections log: O3: Locked-in preferential terms for the US, 6 October 2026

  20. CorrectionP4: Capital follows the law

    What counts
    What counts fr

    Why: Restores the claim being tested and the investor-nationality rule, both part of the prediction as registered on 26 September 2026; the tests themselves are unchanged.

    In the corrections log: P4: Capital follows the law, 3 October 2026

  21. UpdateThis article

    Text of the article

    Why: O3 figures updated: the O3 model now takes the main forecast's current probability (about 80%, from the volume model) instead of an earlier run of that model (about 94%). O3 is now about 22% (range 7% to 37%; about 61% counting only since January 2025; stricter bar about 4%, broader bar about 34%), and O2 alone is about 58%. The count of comparable US deals is unchanged (about 27% that such terms are in force in 2034); the text now says how it is combined with O2.

    In the corrections log: This article, 3 October 2026

  22. UpdateO3: Locked-in preferential terms for the US

    Odds
    was26% now22%

    Why: O3 figure updated: the O3 model now takes the main forecast's current probability (about 80%, from the volume model) instead of an earlier run of that model (about 94%), so O3 is about 22% (range 7% to 37%). The count of comparable US deals is unchanged.

    In the corrections log: O3: Locked-in preferential terms for the US, 3 October 2026

  23. CorrectionCarney walks away from the tentative deal after late US demands on autos, culture and Canada's other trade deals

    Earlier wording withheld: it reproduced a source we may not quote.

    Title
    Title fr
    Summary
    Summary fr
    Caution note
    Caution note fr

    Why: Removed details that rested only on The Hub, which is behind a sign-in wall; the title now names only the late demands reported by CBC News (autos, culture, Canada's other trade deals). Greer's position is covered by CNBC.

    In the corrections log: Carney walks away from the tentative deal after late US demands on autos, culture and Canada's other trade deals, 3 October 2026

  24. UpdateThis article

    Summary
    Text of the article

    Why: Model figures recomputed after Pacific Link was listed on 1 October 2026 as the first project of national interest under Schedule 1 of the Building Canada Act (Prime Minister's Office release, 2026-10-01): the volume model's odds that the pipeline is built rise from 35% to 42%, so O2 or higher falls from about 82% to about 80% (median US$8.5 billion a year above 2024).

    In the corrections log: This article, 2 October 2026

  25. UpdateO2: Faster, and more volume reaches the US (this level or higher)

    Odds
    was82% now80%

    Why: Pacific Link listed on 1 October 2026 as the first project of national interest under Schedule 1 of the Building Canada Act (Prime Minister's Office release, 2026-10-01). The volume model's odds that the pipeline is built rise from 35% (referred) to 42% (listed); with more oil to the coast, O2 or higher falls from about 82% to about 80% (median US$8.5 billion a year above 2024).

    In the corrections log: O2: Faster, and more volume reaches the US (this level or higher), 2 October 2026

  26. UpdatePacific Link (West Coast oil pipeline)

    Name
    wasWest Coast Oil Pipeline (to Roberts Bank) nowPacific Link (West Coast oil pipeline)
    Name fr
    wasPipeline de la côte Ouest (vers Roberts Bank) nowPacific Link (pipeline de la côte Ouest)
    Summary
    Summary fr
    Status
    wasReferred for fast-tracking nowListed as a national-interest project

    Why: Listed on 2026-10-01 as the first project of national interest under Schedule 1 of the Building Canada Act and renamed Pacific Link (Prime Minister's Office release, 2026-10-01); Listed on 2026-10-01 as the first project of national interest under Schedule 1 of the Building Canada Act; conditions due by 2027-09-01, no final investment decision (Prime Minister's Office release, 2026-10-01)

    In the corrections log: Pacific Link (West Coast oil pipeline), 2 October 2026