ClaimMethod
Output is split into projects that don't need the new fast-track laws and projects that depend on them. Only the second group can say anything about the effect of the tariffs, and neither says anything about Washington's intent.
The evidence it rests on
Context (5)
- LNG Canada ships its first cargo from Kitimat, BC, bound for Asia
LNG Canada took its final investment decision in 2018, before the tariffs and the fast-track laws, so it belongs with the projects that don't need the new fast-track laws.
Documented by: LNG Canada, “First Cargo Puts Canada on the Map of LNG Exporting Nations” (external site), . and 3 more
- New England Clean Energy Connect (NECEC, a 1,200 MW high-voltage direct current line from Quebec to New England) enters commercial operation
Needs no fast-track law: a 2018 contract.
Documented by: Hydro-Québec, “Hydro-Québec Form 18-K for 2025” (external site), . and 2 more
- Enbridge takes its final investment decision on Mainline Optimization Phase 1 (+150,000 b/d) and a Flanagan South expansion (+100,000 b/d), US$1.4B
A project that needs no fast-track law, decided during the tariff period.
Documented by: Enbridge, “Enbridge Adding Canadian Egress to Key U.S. Refining Markets, Enhancing North American Energy Security” (external site), . and 2 more
- Canada Gazette notice says Ottawa may list the West Coast Oil Pipeline as a national interest project under the Building Canada Act
The pipeline depends on a listing under the Building Canada Act, so it belongs with the projects that depend on the new fast-track laws.
Documented by: Cassels, “Canada and Alberta Deliver on Proposal for the West Coast Oil Pipeline” (external site), . and 4 more
- Canada, British Columbia and LNG Canada sign an investment co-operation agreement to support a 2026 decision on Phase 2
LNG Canada Phase 2 was referred to the federal Major Projects Office in September 2025; this agreement is a step in the federal and provincial fast-track effort, so it counts among the projects that depend on the new fast-track laws; the partners took the final investment decision on 29 September 2026, while Bill C-39 was still before Parliament and the Mega Deduction was still a draft proposal. It stays in that group as a project referred to the Major Projects Office, but its decision came while neither measure was law.
Documented by: Major Projects Office (Government of Canada), “LNG Canada Phase 2 - Major Projects Office” (external site). and 7 more
Claims are weighed by the evidence under them, actions first. Method.